Vitrified tile flooring with skirting in all units. † Natural Stone / Vitrified Tile / Tremix Concrete flooring in common area.
Electrification
Sufficient electric point with concealed wiring along with modular switches of Anchor or equivalent with one AC/TV/Internet Point in each unit. Exterior glazing & ACP Work as per architect’s design only.
Structure & Wall Construction
Earthquake resistance RCC framed structure design, Internal & External masonary work with brick.Internal wall with laphi & primer and external wall with weather proof paint over double coat plaster.
Doors & Windows
Flush door with both side laminate & safety locks / M.S Rolling shutter with color.Powder coated aluminum sliding / glazing openable window.
PAYMENT SCHEDULE
30% Booking Amount
10% Basement Slab
10% GF Slab
10% 1st Floor Slab
10% 2nd Floor Slab
05% 3rd Floor Slab
05% 4th Floor Slab
05% 5th Floor Slab
05% 6th Floor Slab
10% Possession Time
20% Booking Amount
10% Basement Slab
10% GF Slab
10% 1st Floor Slab
10% 2nd Floor Slab
10% 3rd Floor Slab
05% 4th Floor Slab
05% 5th Floor Slab
05% 6th Floor Slab
05% 7th Floor Slab
10% Possession Time
NOTE
Stamp Duty, Registration Charges, GST (at actual ),or any such present and future additional government taxes, Maintenance Deposit ,Development Charges, and
Electrical Infrastructure charges and Deposit will be charged extra.
Possession will be given only after one month of settlement of all accounts .
Continuous defaults in payments leads to cancellation of booking and refund in case of cancellation will be made within 30 days from the date of booking of new client of same unit after deduction of Rs.50,000/- against administrative charge from booking amount.
Architect / Developers reserve all the rights to change the plan, elevation, specification, or any details will be
binding to all.
Changes in any Structural design & External facade will NOT be permitted under any circumstances. Internal changes will only be permitted with prior permission.
Out door AC Unit will be fitted as per provision in the designed place by the architect.
Project Completion Time may vary as it is highly dependent on labour and matrial
availiblity and approvals from various authorities
The exclusive rights of fifth oor & topmost terrace are reserved by the developers with future or balance FSI availed from local
authority with utilities rights of lift & staircase to this terrace are reserve by the developers
All buyers /members are bound to follow all rules / instructions for future maintenance
of building.
This brochure is for information purpose only, it not form a part of the agreement or any legal documents.
Third floor atrium & common terrace rights to be reserved by developers only.
Dimensions and area may vary according to practical structural construction.