Earthquake Resistant RCC Frame Structure
High Quality block / brick masonry with plaster (Except Ceiling)
FLOOR
Premium Vitrified Tiles in all rooms
Stairs: Stone Treads
KITCHEN
Natural/ Artificial Premium Stone Platform with Quartz Sink.
Designer Ceramic Tiles Dado above Kitchen Platform Up to 7 Ft.
Wash Area with Ceramic Tiles Dado & Natural Stone Floor
SANITARY & FIXTURES
Branded Quality CP Fittings & Sanitary
BATHROOMS
Designer Ceramic Tiles in all Bathrooms up to Lintel Level.
Natural/ Artificial Premium Counter for Basins
DOORS & WINDOWS
Main Door: High Quality Wooden / Stone Frame Door with Veneer Panelling
Internal Doors: Wooden/Stone frame with Laminated flush doors
Slider Windows: High Quality Powder Coated Heavy Aluminium Sections Sliding Windows
FINISH
Internal Mala Plaster with Putty/ Primer Finish
Exterior Paints with Texture Finish
ELECTRIFICATION
Concealed copper ISI wiring, MCB/ELCB & branded modular switches with sufficient electrical points in all area.
Provision for TV & Internet points at convenient locations.
PAYMENT SCHEDULE
30% Booking Amount
10% Basement Slab
10% GF Slab
10% 1st Floor Slab
10% 2nd Floor Slab
05% 3rd Floor Slab
05% 4th Floor Slab
05% 5th Floor Slab
05% 6th Floor Slab
10% Possession Time
20% Booking Amount
10% Basement Slab
10% GF Slab
10% 1st Floor Slab
10% 2nd Floor Slab
10% 3rd Floor Slab
05% 4th Floor Slab
05% 5th Floor Slab
05% 6th Floor Slab
05% 7th Floor Slab
10% Possession Time
NOTE
Stamp Duty, Registration Charges, GST (at actual ),or any such present and future additional government taxes, Maintenance Deposit ,Development Charges, and
Electrical Infrastructure charges and Deposit will be charged extra.
Possession will be given only after one month of settlement of all accounts .
Continuous defaults in payments leads to cancellation of booking and refund in case of cancellation will be made within 30 days from the date of booking of new client of same unit after deduction of Rs.50,000/- against administrative charge from booking amount.
Architect / Developers reserve all the rights to change the plan, elevation, specification, or any details will be
binding to all.
Changes in any Structural design & External facade will NOT be permitted under any circumstances. Internal changes will only be permitted with prior permission.
Out door AC Unit will be fitted as per provision in the designed place by the architect.
Project Completion Time may vary as it is highly dependent on labour and matrial
availiblity and approvals from various authorities
The exclusive rights of fifth oor & topmost terrace are reserved by the developers with future or balance FSI availed from local
authority with utilities rights of lift & staircase to this terrace are reserve by the developers
All buyers /members are bound to follow all rules / instructions for future maintenance
of building.
This brochure is for information purpose only, it not form a part of the agreement or any legal documents.
Third floor atrium & common terrace rights to be reserved by developers only.
Dimensions and area may vary according to practical structural construction.